They walked the acreage next. Corbin led them to the silo pad, the flat concrete expanse where the old silo had stood before being demolished years ago. He paced the dimensions, his stride measured, and unrolled his survey photocopy across the concrete, weighting the corners with stones.“This is where we build,” he said.He opened his notebook to the workshop sketches and laid them out on the survey page. Charlie crouched beside him, her knees pressing into the concrete, and studied the drawings in the flat afternoon light.The automotive section occupied the larger footprint. Two bays facing south, with the two-post lift in Bay One and the four-post in Bay Two. A fabrication area along the back wall, with a welding bay vented through a dedicated exhaust system. Parts storage in a separate room with climate control. Tool organization along the east wall, with pegboard panels and a rollaway cabinet station. Ceiling clearance marked at fourteen feet. A notation specified the lift pad c
Last Updated : 2026-11-27 Read more